A pile is deemed to have reached its founding depth based on the Ultimate Jacking Force (UJF). Generally, the UJF is set at 2.0 to 2.5 times the working load of the pile. To satisfy termination criteria, the pile must sustain the required UJF over a specific number of cycles (typically 3 cycles) with a settlement rate that does not exceed local Singapore regulatory limits. Quality Control, Monitoring, and Risk Mitigation

In all cases, deviations must be documented and the Qualified Person must approve any changes.