Verify the site was ready before the physical setup began. Use checkbox form fields in Word for this section. Foundation/flooring cured, leveled, and rated for weight.
| Parameter | Observed Value | Standard | Status | |-----------|---------------|----------|--------| | Supply voltage (L-L / L-N) | | | | | Current draw (no load) | | | | | Motor RPM | | | | | Temperature rise (bearing/winding) | | | | | Noise/vibration level | | | | | Control panel functions | — | — | OK / Not OK | machine installation report format in word
Double-click the top of the page to open the menu. Verify the site was ready before the physical setup began
: Names of the installation engineer, supervisor, and client representative. Date : The exact day the installation was finalized. 2. Pre-Installation Requirements | Parameter | Observed Value | Standard |